Skip to content
Boilers.caby ROMA Heating & Cooling

Lochinvar · Power-Fin (PBN/PBL)

Lochinvar Power-fin PBN1002-M9

The Lochinvar Power-fin PBN1002-M9 is a non-condensing copper-tube vertical commercial boiler rated 199.8-999 MBH input, 849 MBH gross output and a 739 MBH net AHRI water rating at 85% thermal efficiency.

CurrentSold in Canada

Key figures

Max input
999 MBH
Max CSA output
AFUE
Min input
199.8 MBH
Natural gasPropaneHeating-onlycommercial

Input is gas energy consumed; output is heat delivered. Never size from input alone.

Lochinvar Power-fin PBN1002-M9 in practice

The Power-fin PBN1002-M9 is the 199.8-999 MBH size of Lochinvar's non-condensing copper-tube vertical commercial boiler line. The printed rating table lists 849 MBH gross output, a 739 MBH net AHRI water rating at a piping and pickup allowance of 1.15, 4.3 gallons of water content, 2-1/2" water connections, a 1-1/4" gas connection and 6" air and 6" vent connections, all at 85% thermal efficiency.

The burner modulates at 5:1 turndown, and the boiler runs on natural gas (PBN) or propane (PBL) with no LP deration printed. The I&O notes that Power-fin boilers require special gas venting — Category II or IV in AL29-4C stainless steel — and that standard units operate from sea level to 4,500 ft with a 4.5% derate per 1,000 ft, while high-altitude builds cover 3,000-5,500 ft. The SMART TOUCH display and CON·X·US remote connect are standard, and the cascading sequencer links up to eight boilers.

Best suited to

  • Commercial hydronic loads near 999 MBH input
  • Buildings replacing an older Power-fin PB or PBN boiler
  • Plants that want the printed net AHRI water rating for sizing

Applicability and support

Model number
PBN1002-M9
Canadian availability
available
Production status
current
ROMA supplies
Confirmed at consultation
ROMA services
Confirmed at consultation
Warranty
Series terms

Where ROMA provides on-site service

On-site service is currently offered in Greater Vancouver, BC, including Vancouver, Burnaby, Richmond, Surrey, Coquitlam, North Vancouver, West Vancouver, New Westminster, Port Coquitlam, Port Moody, Delta, Langley, Maple Ridge, Abbotsford, Chilliwack, White Rock, Pitt Meadows, Tsawwassen, Anmore, Lions Bay, Belcarra, Bowen Island, Mission. Everything else on this site is reference information you can use anywhere in Canada.

See all service areas

Specifications

Published specifications

Values as published by Lochinvar. Units are shown with every value; notes flag conflicting sources or missing figures.

Lochinvar Power-fin PBN1002-M9 specifications
SpecificationValueNote
Input
Heating input, minimum199.8 MBHPer the I&O Rev A ratings table (M9 firing).
Heating input, maximum999 MBHPer the I&O Rev A ratings table.
Output
Gross output849 MBHPer the printed sizing table.
Net AHRI water rating739 MBHNet AHRI rating based on a piping and pickup allowance of 1.15.
Efficiency
Efficiency (thermal)85 %Thermal efficiency printed on the model's product page.
Venting and air
Air inlet size6"Per the printed sizing table.
Vent size6"Per the printed sizing table.
VentingCategory II or IV special gas vent (AL29-4C)Per the I&O's venting notes; Power-fin boilers require special gas venting.
Physical and connections
Water content4.3 galPer the printed sizing table (the PBX-PS-05 product summary prints the same water capacities for the 2500-5000 sizes).
Water connections2-1/2"Per the printed sizing table.
Gas connection1-1/4"Per the printed sizing table.
Operating limits and other
Turndown5:1Printed on the model's product page and in the PBXT-Sub-07 submittal's standard features.

Frequently asked questions

What are the Power-fin PBN1002-M9 ratings?

The printed rating table lists 999 MBH maximum input, 849 MBH gross output and a 739 MBH net AHRI water rating at 85% thermal efficiency.

What fuel does the Power-fin use?

Natural gas is printed as the PBN model and propane as the PBL model — the ratings tables say "Change 'N' to 'L' for L.P. gas models" with no LP deration.

How is the Power-fin vented?

The I&O requires special gas venting for Power-fin boilers, Category II or IV in AL29-4C stainless steel, with the air and vent connection sizes printed per model in the rating table.

Questions about the Lochinvar Power-fin PBN1002-M9?

Describe what the boiler is doing and get a straight answer about the next step.

On-site service in Greater Vancouver, BC. ROMA lists “Open 7 days” on its site; call to confirm same-day availability.

Sources and verification

Facts checked September 9, 2026. Last updated September 9, 2026. Technical reviewer: not yet assigned.

CallEmailEstimate